Post-Construction Site Runoff Control

This permit section focuses on mitigating stormwater impacts from new and re-development by requiring practices that treat, store, and infiltrate stormwater onsite. Towns should use the minimum disturbance size they normally regulate (whether it's 0.5 acres per the Erosion Sediment Control Act or smaller if your town uses a lower threshold) for the stormwater retention standards in this section.

Please visit the UConn NEMO Post-Construction Stormwater Management page for the following information:

  • Relevant Terms
  • Resources including:
    • Low Impact Development
    • Directly Connected Impervious Area (DCIA)